New Grice Bog and Wetland Garden

A new and exciting project will be underway at Grice this month.  Groundbreaking will begin on a new wetland and bog garden located on the Southeast corner of the building.  This project was spearheaded by graduate students Rebecca Balazs and Sharleen Johnson, with assistance from Lab Manager Greg Townsley.  Rebecca and Sharleen wrote a proposal and received a small grant from the ECOllective Fund from CofC’s Office of Sustainability.  The Garden will utilize condensation runoff from the HVAC chiller on Grice’s roof.  This water will be piped to a small pond, then distributed to a couple of wetland container gardens, including one which will be an acidic bog where native carnivorous plants will reside.  The large amount of condensate water was originally pooling on the east side of Grice, which could potentially damage the building.  Construction will begin February 14, 2015.  You can view the layout below.

 

Bog Garden Drawing 2.3.15

Leave a Reply

Your email address will not be published. Required fields are marked *